Welcome to the Checkmate Community Forums forums.
You are currently viewing our boards as a guest which gives you limited
access to view most discussions, articles and access to our other FREE features.
By joining our free community you will be able to:
Registration is fast, simple and absolutely free so please, join our community today!
If you have any problems with the registration process or your account login, please contact support by clicking here or by using the"contact us" link at the bottom of the page.

Kevin,
My suggestion is to use the relief under all bulkheads so the water
can drain to the transom.
And both stringers. You want to make sure if water ever got in on the outside of those stringers it's got a place to go.Drill a couple of weep holes so water can get to the bilge area.
Thanks Robie, I missed on that!
Yeah there will be zero way that water will sit in this boat. You can't see them but there are drains in both stringers and both bulkheads.
Question do you think I need to replace the center knee that came from the top down on the trans. I would like to use the trans stiffiner on top and bottom but can only use the bottom if the knee goes back in.
thanks

That looks great! I am itching to get mine really moving along. I have to kick it into high gear. Great work, what is the ply thickness and what type of fill did you use? Did you feather in the edges and fill with bondo or is it just a plain 90° edge cut to width and bondo fill ? 